Parts are half the job. We do the other half.
Repair, programming and commissioning delivered by automation engineers who have stood on the same factory floors your team does.
Parts are half the job.
We do the other half.
Repair & Refurbishment
Send the unit model, fault description and photos for review. Testing method, turnaround and deliverables are defined in the written scope.
Learn morePLC & HMI Programming
Send the controller model, software version and required outcome. Scope, deliverables and availability are confirmed before work begins.
Learn moreOn-site Commissioning
Panel start-up, Siemens/ABB drive tuning, PROFINET and EtherNet/IP network validation, and operator handover at your plant across India, the Middle East and Southeast Asia.
Learn moreObsolescence Management
Send the existing part number, application and electrical requirements for a documented replacement review.
Get a cross-referenceUrgent Procurement
Submit the exact part number, quantity and required date. Availability and the earliest feasible dispatch option are confirmed in writing.
Contact supportKitting & Pre-assembly
We kit your complete BOM, label each component to your tag-number schedule and deliver project-ready, numbered boxes to your panel shop or site. Reduces your goods-in processing time by up to 70%.
Upload your BOMFrom fault code to running line
1 · Describe the fault
Email support@growing-automation.com with the fault code, rating-plate photo, machine name and location. The team will confirm whether the request can be assessed.
2 · Fixed-price scope
You get a written scope with a price and a committed date before anything is dismantled. No open-ended labour rates — we quote in INR with GST for Indian customers.
3 · Complete the agreed work
Repair steps, replacement components, testing and documentation follow the accepted written scope for that unit.
4 · Back on the line
Return shipping is tracked and insured door-to-door. For critical downtime we ship a loan unit — a working Siemens S7 rack, ABB ACS drive or similar — while yours is on the bench.
Installed-base mapping
We audit your installed base, flag every line heading for end-of-life over the next 36 months, and hold strategic buffer stock against your specific part numbers so you are never caught short.
Technical validation
Available part references, specifications and testing requirements are documented for buyer approval before work or supply proceeds.